Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Sealing Tips – Selecting Flow Control Devices on Plan 11 Piping Plans

Engineering & Design
Flowserve

Sealing Tips – Selecting Flow Control Devices on Plan 11 Piping Plans

Author:Michael Huebner, Principal Engineer,Flowserve

Mechanical seals generate heat during operation due to mechanical friction and fluid shear between the seal faces. One of the most common strategies to remove this seal generated heat and create a cooler environment in the seal chamber is through a Plan 11. A Plan 11 directs process fluid from a high-pressure region of the pump through a flow control device, through the seal chamber, and back into the process. Sizing the flow control device is a critical parameter in setting up this system.

The flow rate of a Plan 11 is determined by the differential pressure between the starting point (e.g. pump discharge) and the ending point (e.g. pressure downstream of the seal chamber) of the fluid flow as well as the restrictions in the system. The most common flow control device is an orifice due its simplicity. It is a common industry practice to use an orifice with a diameter of 3mm (or 0.125”) or greater to minimize the potential for plugging due to debris in the process fluid. In many cases, it is necessary to use more than one orifice due to a high differential pressure in the Plan 11 system. In some cases, other flow control devices such as a pressure breakdown coil may be required.

Flow through the Plan 11 will also be influenced by a throat bushing in the back of the seal chamber. This may be desirable especially if there is a benefit in increasing the pressure in the chamber. The most common throat bushing (e.g. fixed bushing provided by pump OEM) will have little impact on the flow or pressure in the Plan 11 due to the clearances. If a bushing is required to control flow or raise pressure, it must be specifically designed and analyzed for the application. This will normally require a floating, close-clearance bushing.

Flowserve

Throat bushing in seal chamber

In a normal Plan 11 system, the orifice sizing almost exclusively determines the flow through the system. Other elements such as tubing size, tubing length, or number of or fittings have much less of an influence. Even the use a single point injection or distributed flush will have far less of an impact on flow than the orifice sizing. Seal OEMs can help provide guidance on the required flow rate and specifications for the components in a Plan 11 for specific applications.

As the Oil and Gas Industry Strengthens, New Challenges Emerge

Related Articles

Related Whitepapers

Carlsberg taps into process water reuse with onsite treatment

Carlsberg brewery wants to cut its water use by 50% by 2030. The initiative, Zero Water Waste, is part of Carlsberg’s Together Towards Zero program.…

Water and Wastewater Industry Checklist for Variable Speed Drives

Resilience is the ability to cope with, and recover from, disruption and to anticipate trends and variability in order to maintain services for people and…

Overcoming energy efficiency challenges in the water and wastewater industry

Water demand is continuing to increase as the global population grows. Clean water is required by people for drinking, cooking, and washing, and by industrial…

Always-on Steam Trap Monitoring Yields 2.9x Return & Reduction of CO2 Emissions [Case Study]

In 2020, Trinity Manufacturing, a premier manufacturer of specialty agriculture and water treatment chemicals, engaged Everactive to help deliver on its safety, sustainability, and operational…

Comments

Leave a Reply

Your email address will not be published.

Join the #PumpTalk Community


By submitting this form, you are consenting to receive marketing emails from: raybet & raybet 雷竞技 , 2205-C 7th Street, Tuscaloosa, AL, 35401, //www.stokoptom.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email.Emails are serviced by Constant Contact